Yunnan Chuxiong Steel Structure Heated Swimming Pool Project

   

Solution: The Spring Legend Villa Recreational Pool Project

 

This Gym Pool is Steel Structure, which is built in 1 month.

Prepare an open space, polish the floor, and you can start building the pool without spending a lot of manpower and material resources to dig the pool. This above-ground swimming pool is surrounded by thick steel plates, equipped with a stable triangular structure, and the swimming pool is not easily deformed. Put anticorrosive wood skirts around and around the pool. Then install the swimming pool accessories and equipment, such as water pipe, pool filtration system, pool heat pump, pool disinfection system. As you can see, it is not impossible for a large swimming pool to be completed within 30 days.

 

Products:

Steel Structure Swimming Pool

Pool liner

Pool Heater Pump

Pool Sand Filter

Pool Water Pump

Medium Pressure UV System

Contact Degaulle Pool

Please provide your information in the form below. *Indicates required fields.

contact us

contact-email
contact-logo

Guangzhou Denor Swimming Pool Equipment Co.,Ltd

We provide customers with quality products and provide high-quality services

看不清,请点击我!

If you would like to leave us a comment please go to contact us

Phone:+86 13922279824

Email:degaulleswimpool@denorpool.cn

contact-clo
top