Laos Five Star Hotel Swimming Pool Project

   

Project Details

Solution: Laos Five Star Hotel Swimming Pool Project

The hotel was built by Laos Jadapeng Group Co., Ltd. and will be one of the reception hotels of the 9th Asia-Europe Summit held in Vientiane, Laos in early November 2012. It is of great political significance.
The swimming pool project started in July this year. The swimming pool specifications are: length 50m* width 15m, water depth: 0.9m-1.5m, cycle: T=6 hours, irregular swimming pool, and a diameter 2m, a circular massage pool with a water depth of 1m.
The swimming pool project's circulating filtration system uses three high-speed filter sand cylinders with a diameter of 1.4m and a height of 1.58m, and four 3.4kw circulating water pumps. The swimming pool disinfection system uses automatic and manual dosing.

Products:

Sand Filter

Air Source Swim Pool Heat Pump

Contact Degaulle Pool

Please provide your information in the form below. *Indicates required fields.

contact us

contact-email
contact-logo

Guangzhou Denor Swimming Pool Equipment Co.,Ltd

We provide customers with quality products and provide high-quality services

看不清,请点击我!

If you would like to leave us a comment please go to contact us

Phone:+86 13922279824

Email:degaulleswimpool@denorpool.cn

contact-clo
top